SITE WORKS
Description USD
I- Excavation & Clearing  
1- General excavation of normal soil, including hauling away and dumping of material to municipality-approved pits 6-8
2- General excavation of rock, including hauling away and dumping of material to municipality-approved pits using explosives 7-9
3- Ditto, using mechanical equipment/machinery 10
4- Manual excavation for trenches/pits for foundations in normal soil, average depth 1m 4-6
5- Clearing of site in soft to medium hard ground, including hauling away and dumping of material to municipality-approved pits 10-12
   
II- Filling & Backfilling  
6- Backfilling with approved excavated materials stored on site around foundations, including watering and compaction (in layers not exceeding 300mm depth) 10-13
7- Filling over site to make up levels with approved important material, including watering and compaction (in layers not exceeding 300mm depth) 10-12
   
III- Shoring  
8- Diaphragm wall for watertight excavation, including excavation and tie-back system, 600mm thick 400-425
9- Ditto, 800mm thick 450-475
10-Interspaced pile wall with shotcrete for dry excavation, including excavation and tie-back system 300-325
11-Secant pile wall for watertight excavation, including excavation and tie-back system 350-375
   
IV- Foundation Piling  
12-Micro piles, using hydraulic piling machinery, 150-250mm diameter (per linear meter of piles) 95-100
13-Bored piles, using hydraulic piling machinery, 500mm+A10-600mm diameter (per linear meter of piles) 111-120
   
Excluding VAT  
Last updated on Feb 2008